CM inaugurated a second-level flyover at Bairamalguda

Cm Revanth Reddy Inaugurated Second Level Flyover At Bairamalguda 09 03 2024 (2)

Hon’ble Chief Minister Sri A. Revanth Reddy inaugurated a second-level flyover at Bairamalguda in Hyderabad on Saturday.

CM Revanth Reddy’s speech points

My heartbeat increases whenever I come to LB Nagar. My strong supporters are staying in this area. The affection shown by the local people to me is memorable.

The government is striving hard to develop the state as a role model in the country. The Hyderabad city will be developed in tune with the growing population. The state government took responsibility of the construction of the Metro Rail through Uppal, Nagol, LB Nagar, Hayat Nagar, Owaisi Hospital, Chandrayangutta and Mylardevarpally.

The state government envisaged plans for the Musi Riverfront development project at the cost of Rs 40,000 crore to Rs 50,000 crore. The abandoned Musi River will be revived on the lines of the river Thames in London. The Musi River development project will be taken up on a 55 km stretch as part of ‘Vibrant Telangana 2050’

The government is preparing a master plan for the comprehensive development of the city inside the outer ring road ( ORR) and also developing radial roads under suburban Hyderabad within the 354 km of the regional ring road ( RRR).

The Vibrant Telangana 2050 Mega Master Plan will be conceived by taking suggestions from everyone. Big warning to all those who are trying to obstruct the Metro Rail expansion in Hyderabad. Those who are creating hurdles to Hyderabad development should be shunted out from the city.

Telangana Rising